The Midland Railway (MR) was a railway company in the United Kingdom from 1844. The Midland was one of the largest railway companies in Britain in the early 20th century, and the largest employer in Derby, where it had its headquarters. It amalgamated with several other railways to create the London, Midland and Scottish Railway at grouping in 1923.

The Midland had a large network of lines emanating from Derby, stretching to London St Pancras, Manchester, Carlisle, Birmingham, and Bristol. It expanded as much through acquisitions as by building its own lines. It also operated ships from Heysham in Lancashire to Douglas and Belfast. A large amount of the Midland's infrastructure remains in use and visible, such as the Midland Main Line and the Settle–Carlisle line, and some of its railway hotels still bear the name Midland Hotel.

History Origins

The Midland Railway originated from 1832 in Leicestershire / Nottinghamshire, with the purpose of serving the needs of local coal owners.

The company was formed on 10 May 1844 by the (7 & 8 Vict. c. xviii) which merged the Midland Counties Railway, the North Midland Railway, and the Birmingham and Derby Junction Railway, the Birmingham and Gloucester Railway joined two years later. These met at the Tri-Junct station at Derby, where the MR established its locomotive and later its carriage and wagon works.

Leading it were George Hudson from the North Midland, and John Ellis from the Midland Counties. James Allport from the Birmingham and Derby Junction Railway found a place elsewhere in Hudson's empire with the York, Newcastle and Berwick Railway, though he later returned.

The MR was in a commanding position having its Derby headquarters at the junctions of the two main routes from London to Scotland, by its connections to the London and Birmingham Railway in the south, and from York via the York and North Midland Railway in the north.

Consolidation Almost immediately it took over the Sheffield and Rotherham Railway and the Erewash Valley Line in 1845, the latter giving access to the Nottinghamshire and Derbyshire coalfields. It absorbed the Mansfield and Pinxton Railway in 1847, extending the Erewash Valley Line from the latter between Chesterfield and Trent Junction at Long Eaton, completed to Chesterfield in 1862, giving access to the coalfields that became its major source of income. Passengers from Sheffield continued to use Rotherham Masborough until a direct route was completed in 1870.

Meanwhile, it extended its influence into the Leicestershire coalfields, by buying the Leicester and Swannington Railway in 1846, and extending it to Burton in 1849.

The South-West

After the merger, London trains were carried on the shorter Midland Counties route. The former Birmingham and Derby Junction Railway was left with the traffic to Birmingham and Bristol, an important seaport. The original 1839 line from Derby had run to Hampton-in-Arden: the Birmingham and Derby Junction Railway had built a terminus at Lawley Street in 1842, and on 1 May 1851 the MR started to run into Curzon Street.

The line south was the Birmingham and Bristol Railway, which reached Curzon Street via Camp Hill. These two lines had been formed by the merger of the standard gauge Birmingham and Gloucester Railway and the broad gauge Bristol and Gloucester Railway.

They met at Gloucester via a short loop of the Cheltenham and Great Western Union Railway. The change of gauge at Gloucester meant that everything had to be transferred between trains, creating chaos, and the C&GWU was owned by the Great Western Railway, which wished to extend its network by taking over the Bristol to Birmingham route. While the two parties were bickering over the price, the MR's John Ellis overheard two directors of the Birmingham and Bristol Railway on a London train discussing the business, and pledged that the MR would match anything the Great Western would offer.

Since it would have brought broad gauge into Curzon Street with the possibility of extending it to the Mersey, it was something that the other standard gauge lines wished to avoid, and they pledged to assist the MR with any losses it might incur. In the event all that was necessary was for the later LNWR to share Birmingham New Street with the Midland when it was opened in 1854, and Lawley Street became a goods depot.

Eastern competition The MR controlled all the traffic to the North East and Scotland from London. The LNWR was progressing slowly through the Lake District, and there was pressure for a direct line from London to York. Permission had been gained for the Northern and Eastern Railway to run through Peterborough and Lincoln but it had barely reached Cambridge.

Two obvious extensions of the Midland Counties line were from Nottingham to Lincoln and from Leicester to Peterborough. They had not been proceeded with, but Hudson saw that they would make ideal "stoppers": if the cities concerned were provided with a rail service, it would make it more difficult to justify another line. They were approved while the bill for the direct line was still before Parliament, forming the present day Lincoln Branch and the Syston to Peterborough Line.

The Leeds and Bradford Railway had been approved in 1844. By 1850 it was losing money but a number of railways offered to buy it. Hudson made an offer more or less on his own account and the line gave the MR an exit to the north, which became the start of the Settle and Carlisle line, and it gave the MR a much more convenient station at Leeds Wellington.

In spite of the objections of Hudson, for the MR and others, the "London and York Railway" (later the Great Northern Railway) led by Edmund Denison persisted, and the bill passed through Parliament in 1846.

The Battle of Nottingham In 1851 the Ambergate, Nottingham, Boston and Eastern Junction Railway completed its line from Grantham as far as Colwick, from where a branch led to the MR Nottingham station. The Great Northern Railway by then passed through Grantham and both railway companies paid court to the fledgling line. Meanwhile, Nottingham had woken up to its branch line status and was keen to expand. The MR made a takeover offer only to discover that a shareholder of the GN had already gathered a quantity of Ambergate shares. An attempt to amalgamate the line with the GN was foiled by Ellis, who managed to obtain an Order in Chancery preventing the GN from running into Nottingham. However, in 1851 it opened a new service to the north that included Nottingham.

In 1852 an ANB&EJR train arrived in Nottingham with a GN locomotive at its head. When it uncoupled and went to run round the train, it found its way blocked by a MR engine while another blocked its retreat. The engine was shepherded to a nearby shed and the tracks were lifted. This episode became known as the "Battle of Nottingham" and, with the action moved to the courtroom, it was seven months before the locomotive was released.

The Euston Square Confederacy The London and Birmingham Railway and its successor the London and North Western Railway had been under pressure from two directions. Firstly the Great Western Railway had been foiled in its attempt to enter Birmingham by the Midland, but it still had designs on Manchester. At the same time the LNWR was under threat from the GN's attempts to enter Manchester by the Manchester, Sheffield and Lincolnshire Railway.

To London

King's Cross 1857–1868

In 1850 the MR, though much more secure, was still a provincial line. Ellis realised that if it were to fend off its competitors it must expand outwards. The first step, in 1853, was to appoint James Allport as general manager, and the next was to shake off the dependence on the LNWR to London.

Although a bill for a line from Hitchin into King's Cross jointly with the GN, was passed as the Midland Railways (Extension to Hitchin, Northampton and Huntingdon Railway) Act 1847 (10 & 11 Vict. c. cxxxv) it had not been proceeded with.

The bill was resubmitted in 1853 with the support of the people of Bedford, whose branch to the LNWR was slow and unreliable, and with the knowledge of the Northamptonshire iron deposits. It was passed as the (16 & 17 Vict. c. cviii).

The Leicester and Hitchin Railway ran from Wigston to Market Harborough, through Desborough, Kettering, Wellingborough and Bedford, then on the Bedford to Hitchin Line, joining the GN at Hitchin for King's Cross. The line began its life in a proposition presented for the shareholders by George Hudson on 2 May 1842 as: "To vest £600,000 in the South Midland Railway Company in their line from Wigston to Hitchin." a full decade before realisation. The delay was partly due to the withdrawal of GN's interest in the competing scheme, the Bedford and Leicester Railway, after Midland purchased the Leicester and Swannington Railway and the Ashby Canal and Tramway, which were to have been the feeder lines. With the competition thwarted there was less rush to have this line as well as its branch lines to Huntingdon (from Kettering) and Northampton (from Bedford) finished. Both these branches were subsequently built by independent companies.

While this took some of the pressure off the route through Rugby, the GNR insisted that passengers for London alight at Hitchin, buying tickets in the short time available, to catch a GNR train to finish their journey. James Allport arranged a seven-year deal with the GN to run into King's Cross for a guaranteed £20,000 a year (),. Through services to London were introduced in February 1858. The construction of the Leicester and Hitchin railway cost £1,750,000 ().

St Pancras 1868

By 1860 the MR was in a much better position and was able to approach new ventures aggressively. Its carriage of coal and iron – and beer from Burton-on-Trent – had increased by three times and passenger numbers were rising, as they were on the GN. Since GN trains took precedence on its own lines, MR passengers were becoming more and more delayed. Finally in 1862 the decision was taken for the MR to have its own terminus in the capital, as befitted a national railway.

On 22 June 1863, the (26 & 27 Vict. c. lxxiv) was passed: "An Act for the Construction by the Midland Railway Company of a new Line of Railway between London and Bedford, with Branches therefrom; and for other Purposes".

The new line deviated at Bedford, through a gap in the Chiltern Hills at Luton, reaching London by curving around Hampstead Heath to a point between King's Cross and Euston. The line from Bedford to Moorgate opened for passenger services on 13 July 1868 with services into St Pancras station starting on 1 October 1868.

St Pancras station is a strong example of Gothic Revival architecture, in the form of the Midland Grand Hotel by Gilbert Scott, which faces Euston Road, and the wrought-iron train shed designed by William Barlow. Its construction was not simple, since it had to approach through the ancient St Pancras Old Church graveyard. Below was the Fleet Sewer, while a branch from the main line ran underground with a steep gradient beneath the station to join the Metropolitan Railway, which ran parallel to what is now Euston Road.

The construction of the London Extension railway cost £9 million (equivalent to £ million in ).

To Manchester

From the 1820s proposals for lines from London and the East Midlands had been proposed, and they had considered using the Cromford and High Peak Railway to reach Manchester (see Derby station).